06.27.07
George H. Diller
Kennedy Space Center, Fla.
321-867-2468
STATUS REPORT: ELV-062707
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Mission: Dawn
Location: Astrotech Space Operations Facility
Launch Pad: 17-B
Launch Vehicle: Delta II 7925-H
Launch Date: July 7, 2007
Launch Time: 4:09:31 - 4:36:22 p.m. EDT
In preparation for the upcoming July 3 Flight Readiness Review, the
mission team is working to resolve several issues. These include
engineering checkouts and analysis on solid rocket motor attachment
points strength; cork insulation repair; battery replacement; and
additional technical checkouts of the launch vehicle. Managers also
are ensuring that all tracking elements will be in place to support
the July 7-11 launch window.
The Dawn spacecraft arrived at Pad 17-B this morning and was hoisted
atop the Delta II launch vehicle.
The Flight Program Verification, an integrated test to verify that the
launch vehicle and the spacecraft are working together, is scheduled
for June 29.
The fairing will be installed around the Dawn spacecraft atop the
rocket on July 1.
Mission: Phoenix
Location: Payload Hazardous Servicing Facility
Launch Pad: 17-A
Launch Vehicle: Delta II 7925
Launch Date: Aug. 3, 2007
Launch Time: 5:35:18 a.m. EDT
The solar array lighting test and installation of the spacecraft
parachute are complete.
Spacecraft fueling is scheduled for July 2-3.
Spin balance testing is scheduled for July 11-12
At Pad 17-A, the attachment of the nine solid rocket boosters to the
Delta II first stage is complete. Hoisting of the second stage atop
the first stage is scheduled for June 28.
Previous status reports are available on the Web at:
http://www.nasa.gov/centers/kennedy/launchingrockets/status/2007
-end-